Skip to content

Content calendar ​

The Calendar page shows your posts on a month or week grid so you can see what is scheduled and spot gaps. It is read-only: to move or change a post you open it and edit it. You need the post.view permission, which every role has.

How do I see what is scheduled for a day? ​

  1. Open Calendar in the sidebar.
  2. Switch between month and week with the toggle at the top.
  3. Use the arrow buttons to move back and forward, and Today to jump to the current date.
  4. Click a day. A panel for that date lists its posts with text, platform badges, and a status badge.
  5. Click a post to open its details in a side sheet.

A post appears on its scheduled date. A post with no schedule appears on the day it was created. If a day has nothing, the panel says "Nothing scheduled" and offers a link to the composer. The Create post button in the panel opens New Post.

The calendar loads up to 200 posts for the visible range, so on a very busy month some posts may not show. Use the Content list with filters to see everything.

How do I reschedule a post from the calendar? ​

You cannot drag posts to a new day. Open Content, click Edit on the scheduled post, change the date and timezone, and save. Editing a scheduled post updates its time and does not publish it. This works until the scheduled time passes.

How do I get the same view from code? ​

The calendar is built from the content list. Use GET /api/content?status=pending and read scheduledAt. See Schedule a post and the content API. The MCP list_posts tool returns the same data to an agent.

Common problems ​

SymptomFix
A scheduled post is missingIt may be outside the visible range, or your role cannot view posts. Check the Content page.
Times look off by hoursScheduling uses the timezone you picked in the schedule dialog (default UTC).
You cannot schedule at allFree plans cannot schedule. See Usage and billing.

Next steps ​